GE 9HA.01 H-Class Heavy-Duty Units

GE's HA-family H-class heavy-duty machine: single-shaft, 3,000 rpm cold-end drive, air-cooled hot gas path and can-annular DLN 2.6 combustion. 448 MW in simple cycle and 680 MW in 1-on-1 combined cycle (platform ISO ratings) — the largest single-unit platform in our heavy-frame range, for hyperscale campuses and utility plants.e on the cold end, air-cooled hot section, and can annular DLN 2.6 combustion system. With a simple-cycle output of 448 MW and a combined-cycle output of 680 MW (platform ISO rating), it is the highest‑power single‑unit platform in our heavy‑duty fleet, designed for large data center campuses and grid‑scale power plants.

448 MW · Simple Cycle (ISO),42.9% SC · 63.7% CC,H-class · single shaft,50 Hz,Gas/dual-fuel

Platform Parameters

Typical Technical Parameters (ISO Conditions · Manufacturer’s Published Data)

ParametersValue / Description
Net power of simple cycle448 MW
Simple-cycle net efficiency (LHV)42.9% · heat rate 7,960 Btu/kWh (8,398 kJ/kWh)
Combined cycle 1×1680 MW · 63.7% (LHV)
Combined cycle 2×11,363 MW
Load responseRamp rate 65 MW/min (1×1); hot start < 30 min; turndown to 30% gas-turbine load, 33% plant turndown (1×1)
ArchitectureSingle shaft: 14-stage axial compressor (IGV + variable stators) + can-annular DLN 2.6 combustion + 4-stage air-cooled turbine, 3,000 rpm cold-end drive to the generator
Frequency50 Hz (the 60 Hz model is the 7HA)
FuelNatural gas; distillate back-up (dual fuel) as an option; manufacturer-published capability of 50% hydrogen blends with a pathway to 100%
Typical dutyHyperscale-campus prime power, grid baseload and peaking, combined-cycle plants (1-on-1 / 2-on-1)

Configuration

Single-Shaft H-Class Arrangement

发电机 · 冷端直驱Generator · cold-end drive3,000 rpm · 50 Hz3,000 rpm · 50 Hz14 级轴流压气机14-stage axial compressor进口导叶 + 可调静叶IGV + variable stator vanes罐环形 DLN 2.6 燃烧系统Can-annular DLN 2.6 combustion天然气 · 可选馏分油备用Natural gas · distillate back-up option4 级空冷涡轮4-stage air-cooled turbine热通道热障涂层Thermal-barrier-coated hot gas path进气Air intake排气 → 余热锅炉(联合循环)Exhaust → HRSG (combined cycle)单轴布置示意(非比例):压气机、燃烧系统与涡轮同轴,冷端直接驱动氢冷发电机Single-shaft arrangement (schematic, not to scale): compressor, combustion system and turbine on one rotor, cold-end coupled to a hydrogen-cooled generator

Scope of Supply

Complete sets of equipment, auxiliary machinery, and a full set of documents

Gas Turbine Main Body and Generator

9HA.01 Gas turbine complete unit (rotor, casing, inlet nozzle and exhaust diffuser, DLN combustion hardware) and hydrogen-cooled generator are supplied as a factory‑complete package.

Skid-mounted auxiliary equipment and loose components

Auxiliary modules, piping skids, and components packed in crates shall be delivered in accordance with the packing list; the control system, transformers, emission devices, and other items shall be supplied as per the agreed extensions.

Combined Cycle Expansion and Commissioning

The waste heat boiler, steam turbine, and power plant auxiliary systems are quoted as a separate scope; on-site commissioning, initial firing, combustion tuning, and performance testing can be provided separately.

Random Document

Manufacturer’s technical documentation (subject to actual possession), sealing and inspection records (including borescope images) shall be delivered with the random set, within the scope confirmed in the sales agreement.

Mode of Cooperation

The transaction was executed using named crews and a phased disclosure approach.

H‑class units are quoted individually by name. Information on the unit’s year of manufacture, operating hours, configuration, preservation and inspection records, delivery location, and price will be provided only after the buyer signs a confidentiality and non‑circumvention agreement; condition records (including borescope images) will be released subsequently.
 

The sale agreement and escrow terms are signed simultaneously; the buyer’s deposit into the escrow account is applied against the purchase price and released upon inspection if no material discrepancies are found; if the inspection results show material differences from the condition records, the deposit will be refunded. The buyer’s engineer conducts an on-site inspection after the escrow agent confirms the deposit, accompanied by Changyuan Donggu.

The contracting party is either the listed company’s headquarters or its U.S. subsidiary, selected according to customer requirements; the unit is delivered EXW, with logistics, re‑storage, and commissioning support available at separate quotation.

Collaboration Process

1 · Submit requirements (frequency, fuel, site location, commissioning time)
2 · Sign confidentiality and non-circumvention agreements
3 · Obtain Crew Condition Records and Commercial Conditions
4 · Sign the purchase agreement and escrow terms; deposit the earnest money into escrow.
5 · On-site Inspection, Acceptance, Payment, and EXW Handover

9HA.01 Inquiry for Quotation →

© 2026 Copyright Xiangyang Changyuan Donggu Industrial Co., Ltd.

Powered by 300.cn  

Sorry, there is currently no content in this section.

You can view other sections.

Business license