Listed on the Shanghai Stock Exchange ·603950.SH
GE 9HA.01 H-Class Heavy-Duty Units
GE's HA-family H-class heavy-duty machine: single-shaft, 3,000 rpm cold-end drive, air-cooled hot gas path and can-annular DLN 2.6 combustion. 448 MW in simple cycle and 680 MW in 1-on-1 combined cycle (platform ISO ratings) — the largest single-unit platform in our heavy-frame range, for hyperscale campuses and utility plants.e on the cold end, air-cooled hot section, and can annular DLN 2.6 combustion system. With a simple-cycle output of 448 MW and a combined-cycle output of 680 MW (platform ISO rating), it is the highest‑power single‑unit platform in our heavy‑duty fleet, designed for large data center campuses and grid‑scale power plants.
448 MW · Simple Cycle (ISO),42.9% SC · 63.7% CC,H-class · single shaft,50 Hz,Gas/dual-fuel
Platform Parameters
Typical Technical Parameters (ISO Conditions · Manufacturer’s Published Data)
| Parameters | Value / Description |
|---|---|
| Net power of simple cycle | 448 MW |
| Simple-cycle net efficiency (LHV) | 42.9% · heat rate 7,960 Btu/kWh (8,398 kJ/kWh) |
| Combined cycle 1×1 | 680 MW · 63.7% (LHV) |
| Combined cycle 2×1 | 1,363 MW |
| Load response | Ramp rate 65 MW/min (1×1); hot start < 30 min; turndown to 30% gas-turbine load, 33% plant turndown (1×1) |
| Architecture | Single shaft: 14-stage axial compressor (IGV + variable stators) + can-annular DLN 2.6 combustion + 4-stage air-cooled turbine, 3,000 rpm cold-end drive to the generator |
| Frequency | 50 Hz (the 60 Hz model is the 7HA) |
| Fuel | Natural gas; distillate back-up (dual fuel) as an option; manufacturer-published capability of 50% hydrogen blends with a pathway to 100% |
| Typical duty | Hyperscale-campus prime power, grid baseload and peaking, combined-cycle plants (1-on-1 / 2-on-1) |
Configuration
Single-Shaft H-Class Arrangement
Scope of Supply
Complete sets of equipment, auxiliary machinery, and a full set of documents
Gas Turbine Main Body and Generator
9HA.01 Gas turbine complete unit (rotor, casing, inlet nozzle and exhaust diffuser, DLN combustion hardware) and hydrogen-cooled generator are supplied as a factory‑complete package.
Skid-mounted auxiliary equipment and loose components
Auxiliary modules, piping skids, and components packed in crates shall be delivered in accordance with the packing list; the control system, transformers, emission devices, and other items shall be supplied as per the agreed extensions.
Combined Cycle Expansion and Commissioning
The waste heat boiler, steam turbine, and power plant auxiliary systems are quoted as a separate scope; on-site commissioning, initial firing, combustion tuning, and performance testing can be provided separately.
Random Document
Manufacturer’s technical documentation (subject to actual possession), sealing and inspection records (including borescope images) shall be delivered with the random set, within the scope confirmed in the sales agreement.
Mode of Cooperation
The transaction was executed using named crews and a phased disclosure approach.
H‑class units are quoted individually by name. Information on the unit’s year of manufacture, operating hours, configuration, preservation and inspection records, delivery location, and price will be provided only after the buyer signs a confidentiality and non‑circumvention agreement; condition records (including borescope images) will be released subsequently.
The sale agreement and escrow terms are signed simultaneously; the buyer’s deposit into the escrow account is applied against the purchase price and released upon inspection if no material discrepancies are found; if the inspection results show material differences from the condition records, the deposit will be refunded. The buyer’s engineer conducts an on-site inspection after the escrow agent confirms the deposit, accompanied by Changyuan Donggu.
The contracting party is either the listed company’s headquarters or its U.S. subsidiary, selected according to customer requirements; the unit is delivered EXW, with logistics, re‑storage, and commissioning support available at separate quotation.
Collaboration Process
1 · Submit requirements (frequency, fuel, site location, commissioning time)
2 · Sign confidentiality and non-circumvention agreements
3 · Obtain Crew Condition Records and Commercial Conditions
4 · Sign the purchase agreement and escrow terms; deposit the earnest money into escrow.
5 · On-site Inspection, Acceptance, Payment, and EXW Handover
Xiangyang Changyuan Donggu Industry Co., Ltd.
396 Zuanshi Avenue (Hongshantou Industrial Park), Xiangzhou District, Xiangyang, Hubei 441104, China
SSE Main Board: 603950
Contact Us
Sales & RFQ: sales@cydgsy.com
Gas power: power@cydgsy.com
Tel: +86-710-306-2990
RFQ Form · Careers
Sorry, there is currently no content in this section.
You can view other sections.
Business license