Shanghai Stock Exchange Main Board Listing ·603950.SH
GE LM6000 series units
One of the world’s most widely installed aeroderivative gas turbines: a two-shaft model derived from GE’s CF6‑80C2 high-bypass-ratio aircraft engine, offering aviation‑grade power density, rapid start-up, and excellent part‑load efficiency—making it a leading choice for data center primary power and peaking applications.
≈ 43 MW · PA (ISO),≈ 40% efficiency (LHV),Two-shaft aero‑derivative,Natural Gas / Dual-Fuel,50 / 60 Hz
Platform Parameters
Typical Technical Parameters (ISO Conditions)
The table below lists representative platforms and typical parameters (under ISO operating conditions). For the specific units currently for sale, we can provide the serial numbers, operating hours, test reports, and commercial terms; a complete equipment list will be made available upon signing a confidentiality agreement.
| Parameter | Value / Description |
|---|---|
| ISO power ISO output | ≈ 43 MW (PA type, single unit); PB/PF types up to approximately 50 MW class |
| Lower Heating Value (LHV) | ≈ 40% |
| Total pressure ratio | ≈ 29 : 1 |
| Structure | Two spools: a 5-stage variable-geometry low-pressure compressor, a 14-stage high-pressure compressor, an annular combustor, and high- and low-pressure (power) turbines. |
| Prototype aircraft | GE CF6-80C2 |
| Fuel | Natural gas (dual-fuel configuration available) |
| Frequency and Grid Connection | 50/60 Hz; Example configuration: a 11 kV synchronous generator coupled to a 3,000 rpm drive via a 1.209:1 reduction gear. 50/60 Hz; |
| Typical Delivery | Spot‑order lead time is approximately 2–4 months (subject to commercial confirmation). |
Scope of Supply
Main equipment, auxiliary equipment, and a complete set of documents
Generator and Transmission Chain
Gas turbine core, reduction gear, generator, lubricating oil and fuel gas systems, exhaust stack, sound enclosure, and instrumentation and control.
Waste Heat and Steam Cycle (as per original manufacturer’s configuration)
The waste heat boiler, steam turbine, and steam–water system can be supplied as a complete package, supporting the reconstruction of combined-cycle power plants.
Electrical, Control, and Safety
Control systems (such as Woodward MicroNet Plus), NOx control, transformers and switchgear, fire protection systems, and electrical accessories.
Random Document
OEM manuals and drawings, test reports, maintenance records, operating hour logs, and borescope inspection reports are delivered together with the equipment.
Xiangyang Changyuan Donggu Industrial Co., Ltd.
Hongshantou Industrial Park, Xiangzhou District, Xiangyang City, Hubei Province
SSE Main Board: 603950
Contact Us
Sales and Inquiries:sales@cydgsy.com
Gas Turbines and Power Generation:power@cydgsy.com
Phone:0710-3062990
Inquiry Form· Join us
Website Development:China Enterprise Dynamics Yichang Privacy Policy and Legal DisclaimerThis website supports IPv6 access.
Sorry, there is currently no content in this section.
You can view other sections.
Business license