Investigation report on soil pollution in the old factory of Xiangyang Changyuan Donggu Industrial Co., Ltd.

Investigation report on soil pollution in the old factory of Xiangyang Changyuan Donggu Industrial Co., Ltd.

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2020-09-14 18:36
  • Views:

(Summary description)The old factory area of ​​Xiangyang Changyuan Donggu Industrial Co., Ltd. (investigation plot) is located at No. 100 Diamond Avenue, Xiangzhou District, Xiangyang City, with a total area of ​​92852.4m2, of which the production area is 51725.4m2 and the reserved land area is 41127m2 (the old factory is relocated Previously used for greening). The historical use of the investigated land is as follows:

Investigation report on soil pollution in the old factory of Xiangyang Changyuan Donggu Industrial Co., Ltd.

(Summary description)The old factory area of ​​Xiangyang Changyuan Donggu Industrial Co., Ltd. (investigation plot) is located at No. 100 Diamond Avenue, Xiangzhou District, Xiangyang City, with a total area of ​​92852.4m2, of which the production area is 51725.4m2 and the reserved land area is 41127m2 (the old factory is relocated Previously used for greening). The historical use of the investigated land is as follows:

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2020-09-14 18:36
  • Views:
Information
  The old factory area of ​​Xiangyang Changyuan Donggu Industrial Co., Ltd. (investigation plot) is located at No. 100 Diamond Avenue, Xiangzhou District, Xiangyang City, with a total area of ​​92852.4m2, of which the production area is 51725.4m2 and the reserved land area is 41127m2 (the old factory is relocated Previously used for greening). The historical use of the investigated land is as follows:
  (1) Xiangyang Changyuan Donggu Industrial Co., Ltd. was established on December 9, 2001. It acquired land at No. 100 Diamond Avenue, Xiangzhou District, Xiangyang City in 2004. The old factory area had been empty before construction and was not polluted. The company started the construction of the "Technical Transformation of R&D Capability of Key Components of Engines Above 3L" in December 2008. It was put into operation in March 2010. The main products are cylinder blocks, connecting rods, cylinder heads, tile covers, gear chambers and other metal products. The production process is mainly machining processes such as turning, milling, grinding, boring, and welding processes, and does not involve surface treatment and painting processes.
  (2) In 2010, due to market needs, the company adjusted the products and output of the "Technical Transformation of Key Engine Components and R&D Capabilities of Engines Above 3L" project in the old factory area during the period. Some products were discontinued and new products were added. The production process has been updated, and the previous production lines have been eliminated. There are mainly 25 engine parts production lines with a total production capacity of about 2.5 million pieces (sets) per year. The main production processes are rough milling, drilling, rough grinding, intermediate cleaning, fine milling, fine grinding, final cleaning, and inspection and testing. The process is relatively simple and does not involve other links such as surface treatment and painting.
  (3) In October 2019, the old factory area of ​​Xiangyang Changyuan Donggu Industrial Co., Ltd. was relocated to a new site. The original old factory area is being demolished. The Xiangzhou District Government of Xiangyang City intends to recover the land use right of the land for subsequent development.
  In December 2019, Wuhan Lianda Testing Technology Co., Ltd. was commissioned by Xiangyang Changyuan Donggu Industrial Co., Ltd. to conduct a preliminary investigation of soil pollution in the original old factory located at No. 100 Diamond Avenue, Xiangzhou District, Xiangyang City. The project team complies with the requirements of "Technical Guidelines for the Investigation of Soil Pollution Status of Construction Land" (HJ 25.1-2019) and "Soil Environmental Quality Control Standard for Soil Pollution Risk of Construction Land (for Trial Implementation)" (GB36600-2018), combined with preliminary investigations and site surveys In this survey, a total of 8 soil monitoring points were set up on the site, and a total of 12 soil samples were collected. The monitoring factors include all the items in Table 1 (VOCs, SVOCs, arsenic, cadmium, chromium (VI), copper, lead, mercury, nickel ).
  According to the results of this soil monitoring: (1) The detection results of 7 heavy metal elements (arsenic, cadmium, copper, lead, mercury, nickel, and hexavalent chromium) tested in 12 soil samples did not exceed the "Soil Environmental Quality Construction Land Soil" Pollution Risk Control Standards (Trial)" (GB36600-2018) The screening value of the first type of land, the 39 VOCs and SVOCs tested in this test did not exceed the "Soil Environmental Quality Construction Land Soil Pollution Risk Control Standard ( Trial)" (GB36600-2018) Screening value for the first type of land.
  The preliminary investigation results of the soil pollution situation in the old factory area of ​​Xiangyang Changyuan Donggu Industrial Co., Ltd. showed that all the test indicators of the soil samples in the site did not exceed the "Soil Environmental Quality Construction Land Soil Pollution Risk Control Standard (Trial)" (GB36600-2018) The screening value of the first type of land is not a contaminated land, and meets the soil environmental quality requirements of the nature of the planned land. There is no need to carry out detailed investigation and risk assessment work, and subsequent land development and construction can be carried out.

Scan the QR code to read on your phone

Relevant information

Related Products
 DCEC C cylinder head
DCEC C cylinder head
The cylinder head is installed above the cylinder block to seal the cylinder from above and form a combustion chamber
 DCEC ISD cylinder head
DCEC ISD cylinder head
The cylinder head is installed above the cylinder block to seal the cylinder from above and form a combustion chamber
 ECEC ISZ cylinder head
ECEC ISZ cylinder head
The cylinder head is installed above the cylinder block to seal the cylinder from above and form a combustion chamber
 DFCV Z14 cylinder head
DFCV Z14 cylinder head
The cylinder head is installed above the cylinder block to seal the cylinder from above and form a combustion chamber

Xiangyang Changyuan Donggu Industrial Co., Ltd.

Xiangyang Changyuan Donggu Industrial Co., Ltd.

Tel:86-0710-3062990
Add:396 Diamond Avenue, Xiangzhou District, Xiangyang City, Hubei Province
E-mail:
cydg2001@126.com

CHANGYUANDONGGU

Official account

Copyright © 2020  Xiangyang Changyuan Donggu Industrial Co., Ltd.     Power by 300.cn